Public Notice of Environmental Impact Assessment for the Technical Renovation Project of the 40,000-Unit Annual Production Line for Engineering Drills at Yongkang Kaibang Tools Co., Ltd

Time:2025-09-11 00:00:00

Technical transformation project for the annual production line of 40,000 engineering drills at Yongkang Kaibang Tools Co., Ltd

Publication of environmental impact assessment information

I. Basic Information of the Construction Project


1. Project Name: Technical Renovation Project for an Annual Production Line of 40,000 Engineering Drills;

2. Construction unit: Yongkang Kaibang Tools Co., Ltd;

3. Industry category: C34 General equipment manufacturing;

4. Project nature: technological transformation;

5. Construction site: No. 218, Jiulong North Road, Dongcheng Street, Yongkang City;

6. Total investment and production scale: The total investment for the project is 5.45 million yuan. Utilizing existing factories and adopting advanced technologies and processes, the project will purchase equipment such as machining center machines, rotor winding machines, and cylindrical grinders to carry out technological upgrades on the original project. Upon completion, the project will have a production capacity of 40,000 engineering drills per year. The project is expected to generate an additional sales revenue of 8 million yuan and profits and taxes of 920,000 yuan.


II. Distribution of major environmentally sensitive targets within the scope of environmental impact assessment


类别

保护目标名称

坐标/m

保护对象

保护内容

环境功能区

相对厂址方位

相对厂界距离/m

X

Y

大气环境

湖塘里下村

212436.1

3204074.7

50户共160

居民人体健康

环境空气质量标准》(GB3095 -2012二级标准

8m

锦湖苑

212001.9

3204207.9

3001300

西

340m

水环境

九龙水库

212221.4

3203988.9

非饮用水源,主要为景观用水

/

《地表水环境质量标准》(GB3838 -2002)中的Ⅲ类标准

西南

125m

声环境

湖塘里下村

212436.1

3204074.7

50户共160

/

《声环境质量标准》(GB3096- 20082类标准

8m

注:XY取值为UTM坐标;保护目标坐标取距离厂址最近点位位置

III. Prediction of Major Environmental Impacts

1. Wastewater: In the near term, domestic sewage will be treated and used for greening in the factory area, without being discharged outside. In the long term, the domestic sewage from the project will be discharged into the municipal sewage pipe network after being pretreated and meeting the standards. It will then be uniformly treated by the Yongkang City Sewage Treatment Plant before being discharged into the Yongkang River, with minimal impact on the river.

2. Exhaust gas: According to the estimation and model prediction, the maximum ground concentration ratio (Pmax) of the project's exhaust gas is less than 10%, indicating a relatively small impact on the surrounding environment.

3. Noise: According to prediction and analysis, the noise at the boundary of this project can be discharged in compliance with standards.

4. Solid waste: All solid wastes can be properly disposed of, with minimal impact on the environment.

IV. Proposed main environmental protection measures, environmental risk prevention measures, and expected effects

1. Wastewater: The drainage system of this project implements separate flows for rainwater and sewage, as well as clean and polluted water. Rainwater is collected through the rainwater pipe network and then discharged into nearby rivers. In the near term, oily wastewater from the canteen is pretreated in an oil separator, while other domestic sewage is treated in buried sewage treatment facilities on site and used for greening in the plant area, without being discharged outside. In the long term, the project's domestic sewage will be discharged into the municipal sewage pipe network after being pretreated to meet standards, and then uniformly treated by the Yongkang City Sewage Treatment Plant before being discharged into the Yongkang River.

2. Exhaust gas: An independent enclosed paint dripping and dipping workshop is set up, maintaining a slight negative pressure inside. The exhaust gas is collected and treated through "primary filtration + UV photolysis + activated carbon adsorption" before being discharged through a 15m high exhaust stack. The kitchen fumes are treated by a fume purifier and then discharged into the atmosphere through a roof exhaust stack.

3. Noise: By reasonably arranging the workshop layout, strengthening equipment maintenance, adopting sound insulation and noise reduction measures, and enhancing greening within the factory and at the factory boundary, the noise at the factory boundary can be discharged in compliance with standards.

4. Solid waste: Metal scraps and general waste packaging materials are collected and outsourced for comprehensive utilization; waste saponified liquid, waste packaging barrels, waste lubricating oil, paint slag, waste filter cotton, and waste activated carbon are entrusted to units with hazardous waste disposal qualifications for safe disposal; household garbage is collected and transported by the environmental sanitation department. All solid wastes are properly disposed of, with minimal impact on the environment.

5. Risk prevention: Establish an emergency pool for storing wastewater in case of accidents; equip with necessary emergency tools for leak stopping, maintenance, and communication; set up an emergency rescue organization, clarify responsibilities, prepare emergency plans, etc. The environmental risks of the project are relatively low.

V. Preliminary Conclusion of Environmental Impact Assessment

Only when the enterprise effectively implements various pollution prevention measures proposed in the environmental impact assessment report, completes the "three simultaneities" and environmental protection management work, and ensures the normal operation of pollution prevention facilities and the emission of pollutants meets standards, can the construction of this project be feasible from an environmental perspective.

VI. Content for Public Consultation

1. Object

Government agencies, social organizations, enterprises, institutions, and individuals in the areas affected by the construction of this project, as well as other members of the public who are concerned about environmental protection work related to the project.

2. Scope

We are seeking public opinions and suggestions related to environmental protection during the operation of this project. Content unrelated to environmental protection is not within the scope of this solicitation.

3. Term

Within 10 working days from the date of public announcement, the public may request the environmental impact assessment (EIA) text from the construction unit or the EIA unit. If there are still questions, the public may request additional information from the construction unit.

4. Feedback channel

During the publicity period, the public can provide specific opinions and suggestions through means such as telephone and letter.

VII. Contact information of relevant units

1. Construction unit: Yongkang Kaibang Tools Co., Ltd

No. 218, Jiulong North Road, Dongcheng Street, Yongkang City. Manager Chen: 18757890045

2. Environmental assessment unit: Zhejiang Huanyao Environmental Construction Co., Ltd

No. 48, Huanggu Mountain Road, Xihu District, Hangzhou City. Hu Gong: 13675814656

3. Environmental Impact Assessment Approval Department: Yongkang Branch of Jinhua Ecological Environment Bureau

Yongkang Administrative Service Center, Environmental Protection Bureau Window, Tel: 0579-87101645

Yongkang Kaibang Tools Co., Ltd

March 11, 2019